ASHLEY west SITE

Situated at the crossroads of innovation and accessibility, this prime parcel is not just industrial-zoned – it's an industrial haven. Imagine your operations thriving within reach of Highway 69, making transportation fluid and efficient. The Indiana Toll Road is also within grasp, a testament to your company's strategic vision! If expansion is in your future check out this site’s sister site across Highway 69 with an additional 140 acres available for development.

Site Overview
Site Address Ashley West Sites
County DeKalb County
Time Zone Eastern
Ownership Private
Total Acreage 275
Min Lot Size 35
Zoning Industrial
Foreign Trade Zones FTZ -182

Zoom Prospector

Site 1, Site 2, Parcel 3

Beacon Schneider

Parcel 1, Parcel 2, Parcel 3, Parcel 4

Logistics
Distance to 4 Lane Hwy 5.3 mi; Highway US 6
Nearest Interstate 1.2 mi; Highway 69
Distance to International Airport 47.8 mi
Airport Name Fort Wayne International Airport
Airport Runway Length Main runway length is 11,981'
Rail Service Name Indiana Northeastern Railroad (line runs north of SR 4)
Utilties Electric - Steuben REMC
Electric Utility: Line KV Serving Site 12,500kV (Steuben REMC)
Electric Utility: Line KV Serving Substation 69kV transmission, 12,500kV distribution, 3-phase power
Electric Utility: Substation on Site No substation on site
Electric Utility: Distance to Nearest Substation 1 mi away (not normal feed), another 10 mi away
Electric Utility: Dual Feed Currently not available at site
Electric Utility: Service Provider Steuben REM (depends on engineering where power comes in on site)
Electric Utility: Avg. Annual Outage Steuben REMC is willing to provide reports
Electric Utility: Distance to Service Center 10 mi away, Angola Service Center
Electric - NIPSCO
Electric Utility: Line KV Serving Site 12.5 kV
Electric Utility: Line KV Serving Substation Hudson Substation is within 1 mile of the site and is a 69/12.5 kV substation
Electric Utility: Substation on Site Not currently (available at the project’s expense)
Electric Utility: Distance to Nearest Substation 1 mi away
Electric Utility: Dual Feed Available at the project’s expense
Electric Utility: Service Provider NIPSCO (depends on engineering where power comes in on site)
Electric Utility: Avg. Annual Outage NIPSCO is willing to provide reports
Electric Utility: Distance to Service Center NIPSCO has 2,900 employees located throughout NIPSCO’s service territory to ensure customers receive safe, provides very reliable electric service.
Gas - NIPSCO
Natural Gas: Pipe Size 4" plastic
Natural Gas: Pressure 60 psi
Natural Gas: Provider NIPSCO
Natural Gas: Distance to Property 0.1 mi, runs along HL Thompson Dr
Water/Sewer - Town of Ashley
Water Utility: Pipe Size 10” water, HL Thompson Dr
Water Utility: Distance to Pumping Station The distance to the water plant is 4,760 ft from tower #1 - 3,233 ft and from tower # 2 ( get ready to const.) 2,269 ft (normal operating pressure at the site 63 PSI)
Water Utility: Provider Town of Ashley
Sewer Utility: Pipe Size 10” gravity sewer, HL Thompson Dr & Farrington Dr
Sewer Utility: Provider Town of Ashley

Utility Location Map

 
Maps
Geo Tech Soil Survey N/A
Latitude & Longitude #1- 41.5153, -85.0587, #2 - 41.5143, #3 -85.0619, 41.5092, -85.0595
Wetland/ N/A
2' Topographic Survey N/A
Conceptual Site Layout N/A
Alta Survey With Title Search N/A

Seismic Hazard Map (USGS, 2018)

The Ashley West Sites are in the light blue color

 
Contact Information
Local Economic Development Name Anton King
Local Economic Development Phone Number 260-927-1180
Local Economic Development Email project@dekalbedp.org
Website www.dekalbedp.org